Door Finishing ROI Calculator

Air Drying vs Prime Heat Systems Technology
Doors Produced Per Day
50 doors/day
This slider moves with the doors produced per day value.

Your Current Process
All Traditional Ovens + Air Drying

(Industry average – 2 to 4 coats)
Time to Fully Finish Doors
3–4 Days
Doors Reach Assembly
Next Day(s)
Post-Cure Racks
Required
Prime Heat Logo

Prime Heat Systems Technology
Cure-To-Ship in 10 minutes

Inside-Out Cure • Zero Air Drying • Immediate Assembly
Time to Fully Finish Doors
20 Minutes / 50 doors
Doors Reach Assembly
Same Hour
Post-Cure Racks
Eliminated

Assumptions

Financial Impact

(The $1,200 monthly price is based on a 9ft HalCon batch oven — $61,000 total. Prices vary based on tunnel length, tunnel count, and the addition of the automated PowerCart conveyor system. Contact us for details on your specific requirements.)
Monthly Incremental Profit $40,000
Estimated Payback Period 1.5 months
Monthly Payment When Financed
$1,216*
(60 MONTH TERM)
Monthly Profit:
$40,000
NET MONTHLY BENEFIT = Monthly Profit minus the Monthly Financed Payment
Total Profit Per Month
$38,784
(60 MONTH TERM)
*Ballpark estimate based on a typical 60-month financing term: A+ credit rating at 6.75% interest. All rates and terms illustrated in the calculator are variable and are meant for conceptual understanding only. Actual rates may vary based on financing length, current rate adjustments, and credit score.